Case Studies
Henley College, Oxfordshire
Discover how our acoustic solutions are helping architects, contractors and businesses create better spaces across range of of sectors.
Henley College, Oxfordshire
Henley College required an acoustic flooring solution capable of reducing both impact and airborne sound transmission while preserving the character of the existing building. The work also needed to be completed within a demanding programme governed by fixed college term dates.
Project Overview:
Working closely with main contractor Bowmer & Kirkland, an acoustic flooring solution was required across approximately 1,500 m² of the college.
The selected system needed to improve acoustic separation without creating excessive floor height or significantly altering the appearance and layout of the building. Flexibility was also important, allowing the college to make future changes to the internal spaces if required.
The Challenge:
Footfall noise was a key concern, but the floor construction also needed to help reduce airborne sound transmission between adjoining spaces.
Any acoustic treatment had to remain discreet and retain the original character of the building. The available construction height was limited, and the completed floor needed to accommodate potential future alterations.
The installation programme presented an additional challenge, with the work required to meet strict deadlines between active college term periods.
The Solution:
MCW Impact Board 28 was selected as a practical, low-profile floating-floor solution for the 1,500 m² area.
The system provides effective impact and airborne sound reduction while supporting floor constructions designed in line with Robust Details FFT5 requirements. Its interlocking construction creates a stable and continuous acoustic floor across the treated areas.
At only 28 mm thick, MCW Impact Board 28 minimised the increase in finished floor height while providing the required acoustic improvement. The shallow construction also retained greater flexibility for future changes or additional building services.
Project Overview
-
Project Type
Education
-
Location
Henley-on-Thames, Oxfordshire, UK
-
Product Used
MCW Impact Board 28
-
Application
Flooring
-
Build Type
Refurbishment
-
Units
1,500 m²
-
Completion Date
March 2024
START YOUR NEXT PROJECT
Have a project in mind?
Tell the MCW Acoustic Supplies team about your project requirements. Whether you’re planning a new build, refurbishment or specialist acoustic installation, we can help you find the right solution.
Questions, answered
Frequently Asked Questions
Lead times vary depending on the specific products required. If you share your project constraints with us, we will work with you to accommodate your timeline as closely as possible.
No, we support projects of all sizes. Our broad product range allows us to act as a one-stop shop for both large-scale commercial developments and smaller individual projects.
We provide both standard off-the-shelf products and tailored bespoke solutions, depending on your project requirements and design goals.